Global Oil Chelsea - Dolphin Inspection

Location: Chelsea, Massachusetts

Childs Engineering Corporation was tasked by Global Companies to perform a site inspection of the southernmost mooring dolphin at the Global Oil Terminal in Chelsea, Massachusetts.

The purpose of the inspection was to assess the condition of the dolphin support structure, after being severely impacted during the berthing of a barge.

The inspection was performed by a four man engineer/dive team from Childs and consisted of both an underwater and topside assessment of the dolphin structure and concrete walkway.

Owner: Global Companies
Contact: Mr. James Lally, 617/660-1112
​CEC Key Project Personnel: Mr. Richard G. FitzGerald, P.E.

Project Type: Underwater Investigations