Childs Engineering Corporation was tasked by NAVFAC with conducting routine Waterfront Facility Inspections at 89 facilities in Japan, and determining the adequacy of mooring hardware layouts and capacities based on ships that are commonly berthed at 13 of the Fleet and Industrial Supply Center (FISC) fueling facilities in Yokosuka and Sasebo, Japan.
Childs Engineering Corporation was awarded an indefinite quantity contract (1 year with 2 option years) to provide engineering services related to the inspection, assessment and design of repairs for US Naval waterfront structures.
Continue »Childs Engineering Corporation was tasked by Waterson Terminal Services to perform a stability analysis of an existing granite block seawall for ProvPort in Providence, RI. The analysis included calculating factors of safety against sliding due to uniform live loads and crane surcharge loads acting on the seawall.
Continue »Childs Engineering Corporation performed a detailed inspection of the apron, underdeck, and topdeck structural systems. Portions of the inspection were performed under semi-dry conditions at low tide, from a water based platform at high tide, or by implementing the use of Childs’ engineer/divers.
Continue »