Boston, Massachusetts

Childs Engineering Corporation, as a member of the project team, was responsible for the planning of the schematic design and permitting of the waterfront and marine components of this project.

Continue »
Portland, Maine

Childs Engineering Corporation was contracted to design a breakwater system for the Maine Yacht Center following a severe nor’easter that had destroyed their floating dock marina. The Marina was extremely exposed to wind and high waves and during the storm and several floats failed while mooring boats alongside.

Continue »
Charles River, Boston, MA

Childs Engineering Corporation was retained by the Charles River Yacht Club to design repairs and upgrades for their facility on Memorial Drive in Cambridge, MA.  The club membership had decided to repair some of their fixed piers and deck areas associated with the club house that were in poor and unsafe condition.

Continue »