Projects
Project Details
- Location: Seaport World Trade Center, Boston, MA
SERVICES
Commonwealth Pier Revitalization
Childs Engineering provided engineering design and construction oversight for the revitalization of Commonwealth Pier at the World Trade Center in Boston, MA. The project included replacement sheet pile design, apron extensions, MAAB-compliant gangways and platforms, and accessible floats to support vessel access and water shuttle and ferry operations. We also designed structural repairs to the existing concrete deck and steel superstructure.
Working closely with the project architect, owner, and local stakeholders, Childs Engineering provided drawings, showing resource area impacts and narrative for the permitting process, as well as assistance with the overall resilience design, and supported a phased construction plan to minimize operational disruptions. Our team provided on-site construction administration, inspections, and punch list services to ensure the quality, compliance, and long-term performance of the marine infrastructure.
Technical Scope
- Waterfront Inspection
- Hydrographic Survey
- Condition Assessment
- Technical Report Writing
- Structural Load Rating
- Cost Estimating
- Life Cycle Analysis
- Conceptual Design